SharePlex跳过归档的方法是什么-创新互联

这篇文章主要讲解了“SharePlex跳过归档的方法是什么”,文中的讲解内容简单清晰,易于学习与理解,下面请大家跟着小编的思路慢慢深入,一起来研究和学习“SharePlex跳过归档的方法是什么”吧!

创新互联建站2013年开创至今,先为玉山等服务建站,玉山等地企业,进行企业商务咨询服务。为玉山企业网站制作PC+手机+微官网三网同步一站式服务解决您的所有建站问题。
SharePlex跳过归档
Here is the procedure to point Capture to the next available archive log
 
 1. Issue "list config" on source sp_ctrl to determine the current activation ID. For example, in the following output, the current activation ID is 10 (the # after conf.) :
 
sp_ctrl (tispadb1:2100)> list config
 
File Name State Datasource
-------------------------------------------------- ----------
test_xxx_090820 Active o.ACOSDB
 
Last Modified At: 20-Aug-09 03:58 Size: 335 Internal Name: .conf.10
 
 2. Shutdown source Shareplex and execute the following SQL in the source database:
 
UPDATE shareplex_actid SET seqno = < new log that is present on disk>, offset = 0, log_start_offset=0 WHERE actid =  AND instance_name='';
commit;
3. Restart Shareplex and Capture.

感谢各位的阅读,以上就是“SharePlex跳过归档的方法是什么”的内容了,经过本文的学习后,相信大家对SharePlex跳过归档的方法是什么这一问题有了更深刻的体会,具体使用情况还需要大家实践验证。这里是创新互联,小编将为大家推送更多相关知识点的文章,欢迎关注!


分享题目:SharePlex跳过归档的方法是什么-创新互联
文章链接:http://bzwzjz.com/article/hgspo.html

其他资讯

Copyright © 2007-2020 广东宝晨空调科技有限公司 All Rights Reserved 粤ICP备2022107769号
友情链接: 成都企业网站建设 成都网站建设 成都网站设计 成都网站制作 成都网站设计 网站设计 成都网站建设 手机网站建设 成都网站制作 企业网站建设 成都网站设计 重庆网站制作 定制网站设计 营销型网站建设 成都网站制作 网站建设方案 定制网站制作 重庆电商网站建设 网站设计 移动手机网站制作 响应式网站建设 成都网站设计